Black Friday is ending this Friday! 40% off with coupon CYBER40 - Sign up here →
Message type: E = Error
Message class: KP - CO-OM Planning
Message number: 276
Message text: &: Kosten trotz Leistung 0
Plan activity and posted activity for &V1& are both 0. Nevertheless,
costs were planned or posted.
The price for &V1& cannot be calculated as it would involve division by
zero. The costs can therefore not be included in the price calculation.
For plan price calculation, check planning of &V1& and its cost
planning for period(s) &V3&.
For actual price calculation, check postings made to &V1& in period(s)
&V3&.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
Get instant SAP help. Sign up for our Free Essentials Plan.
KP275 &: Politischer Tarif schwankt
Was verursacht dieses Problem? You set a manual activity price in &V1&. Simultaneously, an annual price is calculated for version &V3&a...
KP274 &: Leistung ist 0
Was verursacht dieses Problem? Planning of activity quantities for &V1& in period(s) &V3& is not reconciled. Plan activity for &...
KP277 &: Leistungsbezug bei Leistung 0
Plan activity for &V1& is 0. Nevertheless, activity input was planned for &V2&.Systemantwort The activity price for this activity t...
KP278 Eingehende Leistungsbeziehung in Teiliteration
Was verursacht dieses Problem? In the iterative price calculation framework, the system detected an assignment between &V1& and &V2&...
Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.