How To Fix KP276 - &: Kosten trotz Leistung 0


KP276 - Overview

  • Message type: E = Error

  • Message class: KP - CO-OM Planning

  • Message number: 276

  • Message text: &: Kosten trotz Leistung 0

  • Show details Hide details
  • Was verursacht dieses Problem?

    Plan activity and posted activity for &V1& are both 0. Nevertheless,
    costs were planned or posted.

    Systemantwort

    The price for &V1& cannot be calculated as it would involve division by
    zero. The costs can therefore not be included in the price calculation.

    Wie behebe ich diesen Fehler?

    For plan price calculation, check planning of &V1& and its cost
    planning for period(s) &V3&.
    For actual price calculation, check postings made to &V1& in period(s)
    &V3&.

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler KP276 - &: Kosten trotz Leistung 0 ?







Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author