How To Fix KP276 - &: Kosten trotz Leistung 0


KP276 - Overview

  • Message type: E = Error

  • Message class: KP - CO-OM Planning

  • Message number: 276

  • Message text: &: Kosten trotz Leistung 0

  • Show details Hide details
  • Was verursacht dieses Problem?

    Plan activity and posted activity for &V1& are both 0. Nevertheless,
    costs were planned or posted.

    Systemantwort

    The price for &V1& cannot be calculated as it would involve division by
    zero. The costs can therefore not be included in the price calculation.

    Wie behebe ich diesen Fehler?

    For plan price calculation, check planning of &V1& and its cost
    planning for period(s) &V3&.
    For actual price calculation, check postings made to &V1& in period(s)
    &V3&.

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


KP276 - Details








Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker