Message type: E = Error
Message class: KP - CO-OM Planning
Message number: 267
Message text: Eingehende Leistungsbeziehung in Teiliteration
In iterative activity price calculation, an activity relationship was
determined between cost center &V1&, activity type &V2& and cost center
&V3&, activity type &V4&. Cost center &V1& is not included in the
partial quantity to be iterated. The iterative network is therefore not
complete, which can lead to calculated activity prices which do not
agree with those resulting from an overall iteration.
The activity relationship is transfered, but it is not complete.
Check the activity relationship. If a manually-set activity price
existsfor cost center &V1&, activity type &V2&, the relationship is
correct. If an iterative activity price exists, you should check
whether iterative relationships were used. If in doubt, run activity
price calculation for the entire controlling area.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
KP267
- Eingehende Leistungsbeziehung in Teiliteration ?Get instant SAP help. Start your 7-day free trial now.
KP266
Geschäftsprozeß &1 ohne Objektnummer
Was verursacht dieses Problem? The master data for business process &V1& is faulty. The internal field "Object number" is not fil...
KP265
Während der Verbuchung trat ein Fehler auf
Was verursacht dieses Problem? During activity price calculation posting, a serious system error occurred. The calculation, however, has already be...
KP268
Sender einer Leistungsverrechnung nicht gefunden
Was verursacht dieses Problem? In the iterative activity price calculation framework, a relationship between &V1& and &V2& was dete...
KP269
Objekt & ist nicht vorhanden, hat aber Leistungssätze
Was verursacht dieses Problem? In activity price calculation, activity quantities were read in for object &V1&. However, the object is not ...
Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.