How To Fix KP267 - Eingehende Leistungsbeziehung in Teiliteration


SAP Error Message - Details

  • Message type: E = Error

  • Message class: KP - CO-OM Planning

  • Message number: 267

  • Message text: Eingehende Leistungsbeziehung in Teiliteration

  • Show details Hide details
  • Was verursacht dieses Problem?

    In iterative activity price calculation, an activity relationship was
    determined between cost center &V1&, activity type &V2& and cost center
    &V3&, activity type &V4&. Cost center &V1& is not included in the
    partial quantity to be iterated. The iterative network is therefore not
    complete, which can lead to calculated activity prices which do not
    agree with those resulting from an overall iteration.

    Systemantwort

    The activity relationship is transfered, but it is not complete.

    Wie behebe ich diesen Fehler?

    Check the activity relationship. If a manually-set activity price
    existsfor cost center &V1&, activity type &V2&, the relationship is
    correct. If an iterative activity price exists, you should check
    whether iterative relationships were used. If in doubt, run activity
    price calculation for the entire controlling area.

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler KP267 - Eingehende Leistungsbeziehung in Teiliteration ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author