How To Fix KJ407 - Bitte Vorgang = B oder V eintragen


SAP Error Message - Details

  • Message type: E = Error

  • Message class: KJ - Cost Object Controlling for Make-to-Order Production

  • Message number: 407

  • Message text: Bitte Vorgang = B oder V eintragen

  • Show details Hide details
  • Was verursacht dieses Problem?

    The following <DS:GLOS.results_analysis_data>results analysis data</>
    can be written under a separate cost element according to whether
    inventory or reserves are created or used.
    Work in process or capitalized costs
    Reserves for unrealized costs
    Reserves for the cost of complaints and commissions
    Reserves for imminent loss
    The <LS>Split creation/usage</> indicator is turned on in the relevant
    <DS:GLOS.results_analysis_version>results analysis version</>. This
    means that when you enter results analysis data manually, you must tell
    the system whether the data is to be created or used.

    Systemantwort

    Das System gibt eine Fehlermeldung aus und erlaubt Ihnen nicht, mit dieser Transaktion fortzufahren, bis der Fehler behoben ist.

    Wie behebe ich diesen Fehler?

    Enter either "B" (creation) or "V" (usage).

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler KJ407 - Bitte Vorgang = B oder V eintragen ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author