Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix GJ249 - Anteil des Korrekturpartners & kann nicht verändert werden.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: GJ - Joint Venture Accounting

  • Message number: 249

  • Message text: Anteil des Korrekturpartners & kann nicht verändert werden.

  • Show details Hide details
  • Was verursacht dieses Problem?

    You have tried to change the share of a <DS:DE.JV_PART>partner</> which
    was entered for <DS:RE.RGJVGE01>equity adjustment</> purpose. The share
    of this partner was 0%.

    Systemantwort

    If equity adjustment takes place in a way that the new
    <DS:DE.JV_EGROUP>equity group</> has a partner which was previously not
    in the group, it is necessary to add this partner to the old group with
    a share of 0%. The reason for this is that adjustment postings can only
    be carried out between partners which exist in both the old and the new
    equity group.
    However, the <DS:DE.JV_ESHARE>share</> of a partner which was added for
    adjustment purpose to the old equity group must be 0% and not be
    altered.

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler GJ249 - Anteil des Korrekturpartners & kann nicht verändert werden. ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker