Do you have any question about this error?
Message type: E = Error
Message class: GA - Allocations
Message number: 835
Message text: Kostenstellen und Prozeßkostenrechnung sind in & nicht aktiv
In controlling area &V2& and fiscal year &V1& the cost centers are not
active, nor is Activity-Based Costing active as the operative
accounting system.
The system therefore rejects the maintenance of cycles for assessment
to CO-PA
To carry out a cost center assessment, you must activate the cost
centers for each controlling area and fiscal year. To carry out a
process cost allocation you must activate Activity-Based Costing as the
operative accounting system (Active indicator 2)
Check these settings for the control indicator of the controlling area.
<DS:SIMG.SIMG_CFMENUORK3OKKP>Maintain controlling area</> -> Activate
components / control indicator -> Detail.
Check the validity interval of the corresponding cycle.
<DS:SIMG.SIMG_CFMENUORKEKEU1>Cycle - cost center assessment (actual)</>
<DS:SIMG.SIMG_CFMENUORKEKEU7>Cycle - cost center assessment (plan)</>
<DS:SIMG.SIMG_CFMENUORKE5055>Cycle - process cost assessment (act.)</>
<DS:SIMG.SIMG_CFMENUORKE3055>Cycle - process cost assessment (plan)</>
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
GA835
- Kostenstellen und Prozeßkostenrechnung sind in & nicht aktiv ?Get instant SAP help. Start your 7-day free trial now.
GA834
Keine Zuordnung einer Umlagekostenart zur Kostenart &2
Was verursacht dieses Problem? In allocation structure &v1& there is no assignment of cost element &v2& to an assessment cost eleme...
GA833
Wegen Delta-Verbuchung zusätzliche Belegzeilen erzeugt
Was verursacht dieses Problem? You are executing a cycle and have set the delta update to active. However, during the repeated execution of the cyc...
GA836
Kostenstellen und Prozeßkostenrechnung sind in & nicht aktiv
Was verursacht dieses Problem? In controlling area &V2& and fiscal year &V1& the cost centers are not active, nor is Activity-Based...
GA837
Keine Zuordnung einer Umlagekostenart zu Kostenart und Recovery Indicator
Was verursacht dieses Problem? In allocation structure &V1& there is no assignment of cost element &V2& and recovery indicator &...
Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.