How To Fix FARR_CONTRACT_MAIN129 - Ereignisart der LV &1 muss mit führender LV übereinstimmen.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: FARR_CONTRACT_MAIN - Revenue Accounting: Contract Management

  • Message number: 129

  • Message text: Ereignisart der LV &1 muss mit führender LV übereinstimmen.

  • Show details Hide details
  • Was verursacht dieses Problem?

    Performance obligation &V1& is a time-based and performance obligation
    and has its start date type set to type 3. In this case, the performance
    obligation is to be fulfilled over a period of time that starts from the
    date of an event. Therefore, the event type is required and must be the
    same as that of its leading performance obligation.

    Systemantwort

    The system prevents the change from being made to the performance
    obligation.

    Wie behebe ich diesen Fehler?

    Specify an event type that is the same as the even type of the leading
    performance obligation.

    Vorgehensweise für Systemadministratoren

    Das System gibt eine Fehlermeldung aus und erlaubt Ihnen nicht, mit dieser Transaktion fortzufahren, bis der Fehler behoben ist.


    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler FARR_CONTRACT_MAIN129 - Ereignisart der LV &1 muss mit führender LV übereinstimmen. ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author