Message type: E = Error
Message class: CY - Capacity Requirements Planning
Message number: 725
Message text: & gehört nicht zum Ressourcennetz & im Werk &
The header data of the process order specifies that the operations on
resource network structure &V2& are to be scheduled. However, the
operation has been assigned to a resource that does not belong to this
resource network structure.
Reschedule the operation to a resource in the resource network structure
&V2&, if necessary.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
CY725
- & gehört nicht zum Ressourcennetz & im Werk & ?Get instant SAP help. Start your 7-day free trial now.
CY724
Auftrag & Vorgang & beginnt in der Vergangenheit
Was verursacht dieses Problem? The system is to dispatch an operation. The indicator <ZH>Indicator forwards</> is not set in the strate...
CY723
Auftrag & Vorgang & liegt außerhalb des Puffers Sicherheitszeit
Was verursacht dieses Problem? An operation is to be dispatched so that it lies outside the float after production. However, in the strategy profil...
CY726
& hat keine Verbindung zum Vorgänger & im Ressourcennetz & in Werk &
Was verursacht dieses Problem? The header data of the process order specifies that the operations must be scheduled on a particular resource networ...
CY727
& hat keine Verbindung zum Nachfolger & im Ressourcennetz & in Werk &
Was verursacht dieses Problem? The header data of the process order specifies that the operations must be scheduled on a particular resource networ...
Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.