Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix CKMLVNB052 - Abschlußbuchung für Material &1 &2 bereits erfolgt


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CKMLVNB - Revaluation of Consumption

  • Message number: 052

  • Message text: Abschlußbuchung für Material &1 &2 bereits erfolgt

  • Show details Hide details
  • Was verursacht dieses Problem?

    You want to revaluate consumption for material &v1&, with movement type
    &v2& in valuation area &v3&. In order to do this you have entered the
    periods to be calculated.
    You have already made closing entries for this material in the periods
    concerned.

    Systemantwort

    The System does not allow you to revaluate consumption for this
    material.

    Wie behebe ich diesen Fehler?

    If you want to revaluate consumption for the material, you must reverse
    the closing entries already made for the material in this period first.

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler CKMLVNB052 - Abschlußbuchung für Material &1 &2 bereits erfolgt ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant