How To Fix CACSSESTD113 - Änderung der Abrechnungsplanung historischer Vergütungen


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CACSSESTD - Settlement Scheduling - Transaction Data

  • Message number: 113

  • Message text: Änderung der Abrechnungsplanung historischer Vergütungen

  • Show details Hide details
  • Was verursacht dieses Problem?

    The system has detected the presence of one or more previous versions of
    the current commission case for the business object. The current
    commission case contains new information on the business object that may
    be relevant to remuneration scheduling.

    Systemantwort

    While performing the <ZK>remuneration scheduling</> process step, the sy
    stem checks whether any historic settlement schedules need to be
    changed. The following steps are carried out:
    Establish whether rescheduling is allowed.
    Rescheduling is only triggered if the scheduling rule in the current set
    tlement schedule allows changes (configuration of scheduling rule).
    Check the agreement for settlement rescheduling.
    The scheduling rule to be applied is determined, based on the latest ver
    sion of the business object attributes.
    Determine whether rescheduling is necessary.
    The system checks whether rescheduling could come up with different sche
    duling results than those already in the settlement schedule.
    Rescheduling is not triggered if the same version of the same rule is to
    be applied, based on current information, and the attributes of the
    remuneration line are the same as those on the database, and settlement
    schedule has not been changed. A settlement schedule is considered as
    being changed if more than one version of the settlement schedule header
    exists.
    Recalculation of the settlement schedule based on new information.
    Starting from the business object start date in the document header of t
    he remuneration line, the settlement schedule is recalculated on the
    basis of the new settlement schedule rule (where applicable).
    Comparison of new and old settlement schedule.
    Processing takes place as a logical service that is implemented by the t
    ool for settlement scheduling. Method 02 <ZK>Change Settlement
    Scheduling</> of object type class 25 is used. The old and new version
    of the settlement schedule is transferred to the logical service. The
    standard delivery of the logical service, method 02, accepts the new
    settlement schedule and compares items that have already been converted
    to settlement items.

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler CACSSESTD113 - Änderung der Abrechnungsplanung historischer Vergütungen ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant