How To Fix AO047 - Auftrag &3 gehört zum Kostenrech.kreis &2 statt &1 - bitte korrigieren


AO047 - Overview

  • Message type: E = Error

  • Message class: AO - Appropriation requests - Master data / Customizing

  • Message number: 047

  • Message text: Auftrag &3 gehört zum Kostenrech.kreis &2 statt &1 - bitte korrigieren

  • Show details Hide details
  • Was verursacht dieses Problem?

    You want to assign order &V3& to the appropriation request.
    However, the order is assigned to controlling area &V2&, while the
    appropriation request is assigned to controlling area &V1&.

    Systemantwort

    You can only assign measures to the appropriation request that have the
    same controlling area &V1&.

    Wie behebe ich diesen Fehler?

    Assign a different order. Or check the controlling area assignment of
    order &V3& and of the appropriation request.
    Under certain conditions (if no plan values exist, if there is no
    assignment to an investment program, if there are no other measures
    assigned), then you can change the controlling area assignment of the
    appropriation request.
    Check if the controlling area can still be changed under the
    organizational assignments.
    Also check if you can use the function for creating an order.

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler AO047 - Auftrag &3 gehört zum Kostenrech.kreis &2 statt &1 - bitte korrigieren ?







Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker