How To Fix 61123 - Fehler beim Ermitteln Planungsperiode für Kalender &


61123 - Overview

  • Message type: E = Error

  • Message class: 61 - Fehlermeldungen fuer Bedarfsplanung

  • Message number: 123

  • Message text: Fehler beim Ermitteln Planungsperiode für Kalender &

  • Show details Hide details
  • Was verursacht dieses Problem?

    The system could not determine sufficient planning periods by the
    planning calendar to group requirements by planning calendar periods
    for all the requirements planned in the future.

    Systemantwort

    When a material is planned by using the <ZH>periodical lot size by
    planning calendar</>, sufficient periods must be calculated to group
    requirements by the planning calendar for all requirements.

    Wie behebe ich diesen Fehler?

    Rework the planning calendar with which the material was planned, which
    means calculate new planning calendar periods.
    To do this, go to Customizing for MRP, under the activity
    <DS:TRAN.MD26>Change PPC periods</>.

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


61123 - Details








Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker